Soil, dirt and topsoil are sold by the cubic yard

Almost every soil or dirt estimate comes down to the same three numbers: the area you are covering, the depth you want, and whether you are buying screened soil, cheap fill, or a compost blend. Loose material is sold by volume — the cubic yard — and sometimes by weight, in tons. Get the volume right and ordering is straightforward; get it wrong and you either make a second trip or leave a heap of soil sitting in the driveway. Both are avoidable with one division.

This is the soil and dirt calculator for all of it: a low spot in the yard, a raised bed, a new lawn, or the backfill behind a wall. The arithmetic is identical in every case — only the product and the depth change.

How to calculate cubic yards of dirt

Volume is area times depth, with one conversion to keep the units honest:

cubic feet = length (ft) × width (ft) × depth (in) ÷ 12

cubic yards = cubic feet ÷ 27

There is a shortcut worth memorising, because it does both steps at once: one cubic yard covers 324 square feet at one inch deep. Divide your square footage by 324 and multiply by the depth in inches, and you have cubic yards directly. That single number is the whole trick behind every dirt calculator, dirt estimator and cubic-yard soil calculator you have ever used.

When the area is irregular, split it into rectangles and circles, work each out, and add them up. A border that wraps around a bed is either one shape or two — decide before you measure, not after the second delivery arrives.

Three worked examples

Filling a 20 × 10 ft low spot, 6 inches deep

Area 200 sq ft; depth 6 ÷ 12 = 0.5 ft.

A 4 × 8 ft raised bed, 12 inches deep

The standard kitchen bed, filled to the top.

Backfilling a 30 × 3 ft trench, 18 inches deep

Notice how fast the tonnage climbs. Soil is heavy enough that anything past about two cubic yards stops being a wheelbarrow project and becomes a delivery, which is why the weight column matters as much as the volume.

Coverage at a glance

Depth1 cubic yard coversA 10-yard delivery covers
1 in324 sq ft3,240 sq ft
2 in162 sq ft1,620 sq ft
3 in108 sq ft1,080 sq ft
4 in81 sq ft810 sq ft
6 in54 sq ft540 sq ft
12 in27 sq ft270 sq ft

Read it the other way and it becomes a check on any quote: a cubic yard covering 200 square feet is a half-inch layer, not two inches. Spread thin, a yard of soil goes a surprisingly long way; spread deep, it disappears fast.

Fill dirt, topsoil or compost blend?

The word soil on a delivery docket is a label, not a specification, and the three products are not interchangeable.

The right sequence for a level-and-plant job is fill dirt first to set the grade, then 4 to 6 inches of topsoil to grow into. Buying topsoil to do a fill-dirt job is simply paying more for the same volume.

How deep should the soil be?

Depth is set by the job, and it is the number people get wrong most often — usually too little for beds, and too much for a top-dressing.

TaskDepth
Filling low spots and ruts (fill dirt)Match the surrounding grade
Base under a patio, shed or driveway (fill dirt)Compacted in 2–4 in lifts
Top-dressing an existing lawn1/4–1/2 in per pass
New lawn from seed or sod (topsoil)4–6 in
Planting beds and borders (topsoil)6–8 in
Raised vegetable beds (blend)8–12 in

Two rows cause most of the trouble. Top-dressing more than about half an inch at a time smothers the grass you are trying to help. And building a bed as a thin layer over compacted clay looks fine for a month, then the roots hit the barrier underneath and the plants stall in the first hot spell.

Ordering: tons, truckloads and settling

Loose soil settles 10 to 20 percent as air pockets collapse and organic matter breaks down, and a raised bed can drop several inches in its first season. Order the calculated volume plus about 15 percent, and expect to top up the following spring.

Weight is the other constraint. Screened topsoil runs roughly 1.2 tons per cubic yard and the general fill this calculator assumes about 1.3, but wet soil is 20 to 30 percent heavier again. A dump truck runs out of legal payload before it runs out of volume, which is why a large order splits into several loads even when the arithmetic says one truck would fit. For planning, assume about 6 to 8 cubic yards per load unless the supplier says otherwise.

Loose material is measured as it is loaded, so a yard scooped from a loader bucket can be appreciably under. Buy by the stated volume or weight, and ask for it dropped on a tarp or a hard surface — a heap of soil left on grass kills the patch beneath it within a fortnight.

Where dirt estimates go wrong

Tools for moving and placing soil

Loose soil is sold by volume but moved by hand, and a cubic yard is heavier than it looks. These are the tools that filling a low spot, a bed or a trench actually calls for.

  • Round-point shovel — Fill dirt and topsoil are moved a shovel at a time. A round point loads loose soil cleanly, where a flat spade is for cutting an edge rather than lifting.
  • Wheelbarrow — The page counts wheelbarrows per cubic yard for a reason: a yard is six to ten barrow loads depending on the tray, and most soil work is carried that way.
  • Hand tamper — Fill dirt compacted in 2 to 4 inch lifts holds the grade it was placed at. Loose soil under a shed pad or low spot settles and drops the surface above it.
  • Heavy-duty tarp — A tarp keeps a delivery off the driveway and gives you somewhere to blend a compost mix with the soil before it goes in the ground.

As an Amazon Associate I earn from qualifying purchases. The links above are affiliate links — if you buy through one, the price you pay is unchanged and a small commission helps keep these calculators free. Tools are listed because the job calls for them, not because of commission rates.

Sources and standards

Where these figures come from

Every formula on this page is computed from the published reference material below rather than copied from another calculator.

Figures, formulas and reference tables last verified: 29 September 2026.

FAQ

How do I calculate cubic yards of dirt?

Multiply length by width by depth in feet, then divide by 27. In practice: cubic feet = length x width x (depth in inches / 12), and cubic yards = cubic feet / 27. A shortcut is to divide the square footage by 324 and multiply by the depth in inches.

How many yards of dirt do I need for a 10 x 10 area?

A 10 x 10 ft area is 100 sq ft. At 3 inches deep that is 25 cubic feet, or 0.93 cubic yards (about 1.2 tons). At 6 inches it is 50 cubic feet, or 1.85 cubic yards (about 2.4 tons).

How much does a cubic yard of dirt weigh?

Screened topsoil runs about 1.2 tons per cubic yard and general fill soil about 1.3, which is the figure this calculator uses. Wet soil is 20 to 30 percent heavier, so a single yard can top 1.6 tons after rain.

How much area does a cubic yard of soil cover?

324 sq ft at 1 inch, halving as the depth doubles: 162 sq ft at 2 inches, 108 at 3, 81 at 4 and 54 at 6. Coverage falls off in a straight line with depth.

What is the difference between fill dirt and topsoil?

Fill dirt is mineral subsoil with almost no organic matter, used to change grade and fill holes. Topsoil is the dark, biologically active layer plants grow in. Fill dirt goes underneath; topsoil goes on top of it.

How much topsoil do I need for a new lawn?

Aim for 4 to 6 inches at settled depth. For 1,000 sq ft at 4 inches that is 333 cubic feet, or 12.35 cubic yards, about 14 yards with a 15 percent settling allowance.

How many cubic yards of soil for a raised bed?

A 4 x 8 ft bed filled 12 inches deep is 32 cubic feet, or 1.19 cubic yards. Raise the same bed to 18 inches and it is about 1.8 cubic yards.

How many wheelbarrows are in a cubic yard of dirt?

A cubic yard is 27 cubic feet. A 6-cubic-foot contractor barrow takes about 4 to 5 loads; a small 3-cubic-foot homeowner barrow takes about nine.

Should I order extra dirt for settling?

Yes, about 15 percent. Loose soil settles as air pockets collapse and organic matter breaks down, and a raised bed can drop several inches in its first season.

How do I convert cubic yards of soil to tons?

Multiply cubic yards by the density: about 1.3 tons per cubic yard for general fill and 1.2 for screened topsoil. So 5 cubic yards of fill is roughly 6.5 tons.

More project calculators

Have a suggestion?

Missing a feature or found something off? Tell us — user suggestions decide what we build next.