The base is the patio
Pavers are only as flat as what is under them. The standard build-up is: 4–6 inches of compacted ¾-inch crushed stone, a 1-inch screeded bedding sand layer, then the pavers. Walkways can live with 4 inches of base; a driveway needs 8–12 inches. The calculator assumes you enter the stone depth you plan to compact — order 10–20% extra because crushed stone loses real depth when the plate compactor goes over it.
Two lifts, not one dump
More than 4 inches of stone in a single lift never compacts properly — the top crusts over while the bottom stays loose. Professional practice is two lifts of 2–3 inches, each wetted and compacted with a plate compactor until the screed rails read true.
Geotextile is cheap insurance
On clay or silty soil, lay a non-woven geotextile fabric between the dirt and the stone. It stops the base from punching into the subgrade over the years — a $40 roll versus re-laying the patio in season three.